您好, 歡迎來(lái)到化工儀器網(wǎng)! 登錄| 免費(fèi)注冊(cè)| 產(chǎn)品展廳| 收藏商鋪|
當(dāng)前位置:上海偵權(quán)衡器有限公司>>技術(shù)文章>>Simple installation steps
Simple installation steps
1↓ 2↓ | 3↓ 4↓ |
1↑ 2↑ | 3↑ 4↑ |
Lift the scale-bodies of corresponding marking with the 28MM shackle and assemble with a crane(usually 15T),overturn and lie them flat(pad wood under the scale bodies to prevent the paint scalling off),the marking of 1↓2↓ with the marking of 1↑2↑ of the scale body,the marking of 3↓ 4↓with the marking of 3↑4↑of the scale-body,each should be tighten the scale-bodies with 105 sets of M20×60 socket head cap bolts with M30 adjustable spanner.M20 socket head cap spanner andφSimple installation steps
請(qǐng)輸入賬號(hào)
請(qǐng)輸入密碼
請(qǐng)輸驗(yàn)證碼
以上信息由企業(yè)自行提供,信息內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由相關(guān)企業(yè)負(fù)責(zé),化工儀器網(wǎng)對(duì)此不承擔(dān)任何保證責(zé)任。
溫馨提示:為規(guī)避購(gòu)買風(fēng)險(xiǎn),建議您在購(gòu)買產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。